Thanksgiving drivers on Interstate 94 near Eau Claire have one fewer work zone to account for. The Wisconsin Department of Transportation’s Wednesday update lists no remaining traffic restrictions from this year’s work between the U.S. 53 interchange and Mallard Road. Its Friday bulletin had still listed off-peak single-lane closures in both directions and a reduced speed limit of 60 mph.
The work this year included replacing eastbound pavement from Otter Creek to Mallard Road and replacing the eastbound bridges over County J and County D. The project page places those repairs in a multiyear effort that also includes resurfacing at the U.S. 53 interchange. WisDOT’s Wednesday bulletin lists the overall project through spring 2027.
Farther north, drivers face different conditions on WIS 13 and WIS 27. Southeast of Superior, WisDOT said the WIS 13 bridge over U.S. 2/53 would be fully open once crews finished permanent pavement markings and removed traffic controls. For the WIS 27 bridge work at Sandy Run Creek, WisDOT still listed a detour via Bayfield County N, County A and U.S. 2. Drivers can check 511 Wisconsin for current conditions before leaving.